Cubic yard calculator
Enter the footprint and depth. You get cubic yards and cubic metres side by side, because in Canada you will be quoted in both.
Free · no signup Runs in your browser
How do you calculate cubic yards?
Multiply length by width by depth with all three in the same unit, then convert. One cubic yard is exactly 0.764554857984 cubic metres, or 27 cubic feet. A slab 6 m by 4 m at 100 mm deep is 2.4 m³, which is 3.14 cubic yards. In Canada, ready-mix concrete is sold by the cubic metre while landscape suppliers quote soil, mulch and gravel by the yard, so most jobs need both numbers.
Canada uses both units, on the same job site
This is the part that catches people out. Ready-mix concrete in Canada is batched, ordered and invoiced in cubic metres. Walk to a landscape supply yard for the same project's topsoil, mulch, river rock or road base and you will be quoted by the cubic yard.
So a single backyard project routinely needs both figures, and the conversion is not a round number. A cubic yard is about 76% of a cubic metre — order 10 of the wrong one and you are out by roughly 2.4 m³.
Rather than making you convert, this calculator shows cubic yards, cubic metres and cubic feet together every time.
Depth is where the mistake usually happens
Length and width are almost always in feet or metres. Depth is almost always in inches or millimetres. Multiplying 20 × 16 × 4 without converting that 4 gives a number four times too large, and it looks plausible enough to phone in.
The depth field here takes its own unit for exactly that reason, so you never have to convert 100 mm into metres in your head at the supply counter.
Common depths: 100 mm for a residential slab or walkway, 150 mm for a driveway, 50–75 mm for mulch, 75–100 mm for a gravel base.
Why you should order more than you calculate
The calculated volume is the volume of a perfect rectangular void. Real excavations are never that. Subgrade settles, forms bow outward under the weight of wet concrete, and the bottom of a hand-dug trench is deeper in places than the string line says.
The standard allowance is 5–10% for concrete on a prepared base, and up to 15% for concrete against an earth-formed footing. For soil and mulch the allowance covers settling and compaction rather than spillage.
Running short mid-pour is far more expensive than the extra material. A short-load fee on a second ready-mix truck typically costs more than the half-metre you saved, and a cold joint across a slab is permanent.
The formula
Volume first, conversion second. Keep every dimension in the same unit before multiplying.
rectangular: volume = length × width × depthcircular: volume = π × diameter² ÷ 4 × depthwith waste: order = volume × (1 + waste% ÷ 100)1 yd³ = 0.764554857984 m³ (exactly, since 1 yd = 0.9144 m)1 yd³ = 27 ft³1 m³ = 1.307950619 yd³
The yard-to-metre conversion is exact, not rounded. The international yard has been defined as exactly 0.9144 metres since 1959, so a cubic yard is exactly 0.9144³ cubic metres. Any calculator showing 0.7646 has simply rounded.
For a circular pad, note the formula uses the diameter, not the radius. Using the radius in that expression gives a quarter of the true volume — a common and expensive slip.
Worked example: a driveway apron
A concrete apron 6.0 m long and 4.0 m wide, poured 150 mm deep, with a 10% allowance.
- Convert depth150 mm = 0.15 m
- Volume = 6.0 × 4.0 × 0.153.60 m³
- Add 10% allowance3.96 m³
- In cubic yards = 3.96 ÷ 0.7645548585.18 yd³
- Rounded to the 0.5 m³ order step4.0 m³
Order 4.0 m³ of ready-mix, which is about 5.23 cubic yards.
Ordering 3.5 m³ would leave you roughly half a cubic metre short with the truck already on site. The extra half metre costs a fraction of a short-load fee plus a return trip.
Rough coverage from one cubic yard
- Concrete slab at 100 mm deep — about 7.6 m² (82 ft²)
- Concrete driveway at 150 mm deep — about 5.1 m² (55 ft²)
- Mulch at 75 mm deep — about 10.2 m² (110 ft²)
- Topsoil at 50 mm deep — about 15.3 m² (165 ft²)
- Gravel base at 100 mm deep — about 7.6 m² (82 ft²)
Terms on this page
- Ready-mix
- Concrete batched at a plant and delivered wet in a rotating drum. Sold by the cubic metre in Canada, usually in 0.5 m³ increments.
- Short-load fee
- A surcharge applied when an order is below the supplier's minimum load, commonly around 3 m³. It is charged per load, so a second small delivery attracts it again.
- Subgrade
- The prepared earth or compacted granular layer a slab is poured onto. An uneven subgrade is the main reason real volume exceeds calculated volume.
- Cold joint
- The weak seam left when fresh concrete is placed against concrete that has already begun to set — what you get if a pour stops while a second truck is fetched.
Common questions
How many cubic feet are in a cubic yard?
Exactly 27. A yard is three feet, and three cubed is 27. This is the one conversion in the imperial system that is genuinely tidy.
How many cubic yards is a cubic metre?
About 1.308 cubic yards. Going the other way, one cubic yard is 0.764554857984 cubic metres exactly. The exactness comes from the international yard being defined as precisely 0.9144 metres.
Is concrete sold by the yard or the metre in Canada?
Ready-mix concrete is sold by the cubic metre, normally in 0.5 m³ steps with a minimum load. Landscape materials — topsoil, mulch, gravel, sand — are still commonly quoted by the cubic yard at supply yards. Expect to deal in both units on the same project.
How much extra concrete should I order?
Add 5–10% on a properly prepared and formed base, and up to 15% where concrete is poured against earth-formed footings. The cost of the extra material is far below the cost of a short load and a cold joint.
How do I calculate concrete for a round pad?
Multiply pi by the diameter squared, divide by four, then multiply by the depth. Take care not to substitute the radius into that formula — that would give you a quarter of the real volume.
Where these numbers come from
- NIST — International yard and pound agreement (1959) Defines the international yard as exactly 0.9144 m, which makes the yd³ to m³ conversion exact.
- Canadian Standards Association — CSA A23.1, Concrete materials and methods of concrete construction The Canadian standard governing ready-mix concrete supply and placement.
Last verified 2026-08-01 The method on this page is checked against the sources above at least once a year. Spotted something out of date? Tell us and we will fix it.
Related calculators
Epoxy resin calculator
Work out epoxy volume from area and depth, split into resin and hardener.
Open calculatorAcres per hour
Effective field capacity from working width, ground speed and field efficiency.
Open calculatorOctagon calculator
Area, perimeter and both widths — plus the corner setback for cutting one from a square.
Open calculatorPerimeter calculator
Perimeter and area for every common shape, including irregular polygons.
Open calculatorTile calculator
Work out how many tiles or flooring pieces a room needs from its size and the size of one tile, with a waste allowance, boxes to buy and total cost.
Open calculatorRoof truss
Rise, chord lengths and cut angles from span and pitch, in millimetres or inches.
Open calculator🔧 Trades, farm and workshop calculators
Built metric-first, because Canadian job sites and farms run in litres and hectares.
See all 11 calculators in this section